About

Header image

The BARC Yorkshire regional centre is one of the seven regional centres of the BARC

The BARC Yorkshire Centre runs Harewood Hillclimb which is the longest speed hillclimb course in mainland UK, hosting 12 events each year including 2 rounds of the prestigious MSA British Hillclimb Championship. The venue offers unrivalled views of high speed motorsport action set against a backdrop of the beautiful Wharfedale valley. Cars compete against the clock on the 1440 metre tarmac track, with the latest single seater racing cars reaching speeds of 130 mph.

BARC YORKSHIRE CENTRE ANNUAL AWARDS All competitor trophies listed, with the exception of the Yorkshire Post Trophy, are open to Yorkshire Centre members only.

The Yorkshire Post Trophy Presented to the competitor making the fastest time of the season – open to all competitors.

The Jack Farrar Trophy Presented to the competitor making the fastest time of the season by a centre member Resident in Yorkshire.

Brownlow Peabody Trophy Presented to the centre member running in classes 1A- 1B-1C in a 2 wheel drive car who, over the season, scores the most marks on the Bogey Time improvement scoring system without dropping marks.

The Richard Sutherland Trophy Presented to the centre member running in classes 1A- 1B 1D in a 4 wheel drive car who, over the season, scores the most marks on the Bogey Time improvement scoring system without dropping marks.

The Total Trophy Presented to the centre member running in classes 2A-2B who, over the season, scores the most marks on the Bogey Time improve-ment scoring system without dropping marks.

The Appleyard Group Trophy Presented to the centre member running in classes 2D- 2E who, over the season, scores the most marks on the Bogey Time improve-ment scoring system without dropping marks.

The Wallace Arnold Trophy Presented to the centre member running in classes 3A- 3B-3C who, over the season, scores the most marks on the Bogey Time im-provement scoring system without dropping marks.

The Wendy Wools Trophy Presented to the centre member running in classes 3F-3G who, over the season, scores the most marks on the Bogey Time improve-ment scoring system without dropping marks.

The Arnold Burton Trophy Presented to the centre member running in classes 4A and 4B who, over the season, scores the most marks on the Bogey Time im-provement scoring system without dropping marks.

The Ford Woodhead Trophy Presented to the centre member running in class 5B who, over the season, scores the most marks on the Bogey Time improvement scoring system without dropping marks.

The Guyson Sandblast Trophy Presented to the centre member running in classes 5A- 5C-5D-5E who, over the season, scores the most marks on the Bogey Time improvement scoring system without dropping marks.

Chippy-Iola Vase Presented to the centre member winning the ‘Harewood Seniors challenge’

The Babra Trophy Presented to the lady centre member competitor making fastest time of the season.

Scrutineers Trophy Presented at the discretion of the MSA Scrutineers to the competitor who, in their opinion, regularly presents the best turned out car for scrutineering.

The John Bindloss Trophy Awarded by BARC Yorkshire Centre Committee to the new competitor who has shown the greatest promise, or the established competitor who not having been a regular winner, shows the greatest improvement.

The Tommy Wise Trophy Awarded by BARC Yorkshire Centre Committee for Service to Harewood.

The Derek Clark Trophy Awarded by BARC Yorkshire Centre Committee for Service to Harewood.

The Tim De Dombal Trophy Awarded by BARC Yorkshire Centre Committee to the Marshal or Official who has shown the greatest dedication to duty during the season.

The Ronald Hudson Trophy Awarded by BARC Yorkshire Centre Committee to the Marshal who has shown the greatest dedication to duty during the season.

The Philpot Trophy Awarded by BARC Yorkshire Centre Committee to the Marshal who has performed some task over and above the call of duty.

HAREWOOD CHAMPIONSHIP TROPHIES

The Glenn Garnett Trophy Awarded to the winner of the BARC Harewood Speed Hillclimb Championship.

The Wilson Trophy Awarded to the winner of the BARC Harewood Speed Hillclimb FTD Championship.

The Andreason Trophy Awarded to the highest placed lady in the BARC Harewood Speed Hillclimb Championship Speed Hillclimb Championship FTD Series.

THE EARLY YEARS OF THE BARC YORKSHIRE CENTRE

In 1912 the British Automobile Racing Club was born as the Cyclecar Club.

1922 saw the formation of the Yorkshire Centre at a meeting in the Metropole Hotel , Leeds by which time the club had changed its name to the Junior Car Club.

The Yorkshire Centre was not the first to be formed as the South West Centre and the Manchester Centre [now the North West Centre] emerged a year earlier. The first speed hillclimb to be held by the Centre was in July 1922 on open public roads up Greenhow Hill at Pateley Bridge. Passengers were carried and the entry fee was £1. The weather was good and the JCC Gazette [now Startline] reported that the event was successful in every way. The only non-starter was Raymond Mays in a Bugatti.

This same year the Greenwood Cup was presented by Alfred Greenwood, a Leeds motor trader and the cup is still presented to this day. Membership in 1922 was some 65. Many other varied events followed including the first Scarborough Weekend, further hillclimbs, trials, and gymkhanas. The Centre in the pre-war years monopolised the “Inter-Centre Shield”, a competition between Centres held in the Midlands, as well as dominating the “War of the Roses”, a battle with the North West Centre. There was also an extensive social programme. The Centre ceased activities on the outbreak of the Second World War in 1939.

Although serving all over the world in the Armed Forces, members kept in touch with each other and in 1945 the Centre re-emerged to become the leading Yorkshire motor club lead by George Carlise and Cyril Wilson.

When two of the architects of the post war Centre, Mike Wilson, who masterminded Harewood Hillclimb, and Harry Mason, joined the club in 1947, such events as the Greenwood Cup, Scarborough Weekend, Sleuth’s Mug and the War of the Roses were already back on the calendar. It was in 1949 that the club became the British Automobile Racing Club. In 1950 the All Fools Rally was added to the calendar and became one of the North’s premier events. Centre members were prominent in the staffing of international race meetings organised by the BARC headquarters at Aintree, Goodwood and other circuits.

When Government made timed events on the road difficult the Centre turned its attention to off road speed events, dropping all timed events on the public highway. The Centre was already running Autocross events and these became extremely popular, and to promote this new idea of fast cars in farmers’ fields the Centre, together with the Yorkshire Sports Car Club and the East Yorkshire Car Club, ran events in all parts of East and West Yorkshire with great success.

In 1956 Arnold Burton and his brother Raymond, both enthusiastic Centre members, offered the use of the grounds of their tailoring empire at Hudson Road Mills close to the centre of Leeds. This created a fine and difficult tarmac sprint course which was used three times a year and attracted all manner of exotic motors.

1960 brought an opportunity use Oliver's Mount in Scarborough as a hillclimb, a venue which the Centre had tried to acquire in 1925 ! This event ran successfully for a number of years and proved a great social weekend. Another first for the Centre was to promote Drag Racing and when the Americans visited this country the Centre was charged with organising an event at Church Fenton, attended by 20,000 spectators.

In 1962 the Centre held some 30 events including a Drag Sprint, Burtons Sprints, The Scarborough Rally, All Fools Rally, autocross, Greenwood Cup, gymkhana, driving tests, Sleuths Mug, film shows, club nights, and the BARC Ball at the Queens Hotel with over 400 guests, and of course the first Harewood Hillclimb.

The late sixties saw the introduction of the Castrol BARC Hillclimb Championship, a class based national championship organised and promoted by Yorkshire Centre. Jeff Goodliff was the inaugural champion in 1968.

By the 1970’s the Centre had over 1000 members and a monthly Centre Circular of over 20 pages full of reports, gossip, news, correspondence and adverts galore.

The Yorkshire Centre now concentrates its efforts on making Harewood Hillclimb one of the finest hillclimb venues in the country, which does credit to the Centre and the BARC.

THE CREATION OF HAREWOOD HILLCLIMB

Back in the late 1950's the Yorkshire Centre of the British Automobile Racing Club ran a busy programme of social and competitive events; road rallies, sporting and production car trials, driving tests and sprints, including a sprint held on the access drive of the Hudson Road factory of Montague Burton Ltd, courtesy of Arnold Burton. Active members had access to race meetings at Full Sutton, Rufforth and Linton and hill-climbs at Catterick and Baitings Dam, but the Yorkshire Centre committee were actively seeking a suitable venue where they could organise their own hill-climb. I remember seeing a track winding up the side of the Wharfe valley when stuck in traffic on Harewood Bank and commenting "that would make a lovely hill-climb". I was not the only one to have spotted it!

The Centre had an eye on that track and when the farm came on the market, the tempting prospect of our own venue suddenly became a possibility when Arnold Burton revealed that he was seeking to buy a farm, and that he was prepared to give the club the right to improve the farm road and use it for Hill Climbs. Arnold, a motor sport enthusiast with an Alpine Cup to his credit, has supported the Stockton Farm venue for fifty years and is a Vice President of the BARC. The committee was fortunate also to include among its members some having specialist knowledge that was relevant to the tremendous task of designing and creating a new section of agricultural access road to the bottom of the valley, and improving the existing farm access road, all within a very tight budget and the need to keep within the current planning limitations.

Mike Wilson, as Centre Chairman, was the head of the project, and Arnold Burton, Harry Mason, Derek Clark, Mike Kellett, John and Brian Holroyd, Dick Haley, Maurice Whaley, Ken Oldham, "Chippy" Stross, Derek Scott (the Centre's Legal Advisor) and Malcolm Snowden all figured largely in the organisation of the work. Probably the most significant piece of good fortune was the inclusion in the organising team of Bill Varley, a Civil Engineer who specialised in highway building, and was part of the team creating the M62 motorway, which was slowly advancing from Hull to Liverpool over some very challenging terrain across the Pennines. From the start, the team were impressed with the potential of the road, encouraged by the availability of large flat fields near Harewood Avenue for car parking, but daunted by potential cost, possible legal problems and the need to control random springs on the hillside.

After discussion, a suitable farm access road was sketched out which would be acceptable for planning purposes by providing access to the bottom of the property and would raise the length of the course to approximately 1000 yards. Bill Varley was asked to draw up plans and an estimate of costs for submission to BARC Headquarters. Bill had a tight set of parameters for his design; the road was, and must demonstrably be, an access road for a working farm, it must be acceptable to the planning authorities, and the cost must be realistic. The plan was submitted to HQ in September 1961 and was accepted, so preparations were made to start work in April 1962. The Centre could not afford a full-time Clerk of Works, so Bill Varley assumed that post, assisted by Mike Kellett and John Holroyd who acted as Inspectors; the initial work was completed in June at a total cost of £6820. There was a proposal for a meeting to be held in July, but this was deferred to ensure that all was completely in order before opening to the public in September. There was one odd little hiccup that still remains. The designed line of Orchard Corner was pegged out by Bill Varley as a “parabolic” left-hander followed by a 135 right-hander. The bulldozer that was excavating the line of the corner broke into one of the underground springs, which made the surface very slippery. The ‘dozer skidded and tore out the pegs: the driver put them back where he thought they had been, and carried on digging, with the result that the line of the corner was two to four feet away from what was intended. By the time the error was discovered it was too late to do anything about it, so the road to this day is not quite as Bill planned it.

The opening meeting was a great success, attracting enthusiastic comment from competitors and spectators, and Tony Lanfranchi set the first hill record. The RAC Steward of the day commented that the course had the potential to be the best on the British Hillclimb Championship circuit and requests from competitors to be included on the mailing list for future Entry Forms flooded in. The running of that first meeting had revealed that the road surface needed to be improved as a matter of urgency, but this was held up by the savage winter of early 1963. There was one positive outcome of that awful winter. The work on the track had ensured that the milk tanker got through to the farm every day without damaging the farm’s vital access road!

The original surface was tar and chippings, with no kerbs to contain it. This broke up badly from the beginning and at the June meeting in 1963, held on the hottest day of the year, it deteriorated into ruts, making it essential for the committee to undertake re-surfacing. In the absence of money to do the job, Mike and John proposed that the work could be done with direct labour. They bought the tarmac from Skipton Rock, borrowed a road laying machine from Totty’s complete with a two-man crew, recruited a team of Irish navvies in the Whip pub in Lower Briggate and did the job for £1500. They provided a surface that lasted for almost twenty years, in time for our first National meeting in September, when Peter Boshier-Jones (Lotus 22) knocked three seconds off the course record; the event was included in the British Hillclimb Championship. Harewood Hillclimb was up and running.

The next time that self-service labour was used was when a team of members under the direction of Martin Frost, and including most of the current crop of senior officials, created an unmade road down the western boundary of the site with the assistance of digger and dumper courtesy of Chippindale Engineers. This project was the construction of the return road that enabled cars to get from the paddock down to the start rather than having to wait in batches to be sent down to the holding area by the old start pad. It ran parallel to Quarry Straight, then went behind the pig-sties and followed the western edge of the field before turning right and running along the bottom fence (behind the current marshals’ post at the Esses) to join the existing course at the start assembly area. To this was added a concrete road down from the western hillside car park to allow competing rally cars down into the track behind the piggeries and the loose-surfaced section, in time for use as a stage on the 1974 RAC Rally of Great Britain. The two functions were related; the possibility of using Harewood as a stage in the RAC Rally of Great Britain was mooted before the work took place, and the opportunity of a fund-raising spectator event in the winter season made the financing of the work viable. The rally stage started near the western gate, followed the track along the hedge into the western hill-top car park, hairpinned left onto the concrete track to join the return road behind the piggeries and followed the return road down to the start pad to join the hill and finish about 100 yards beyond the cattle-grid. Parts of this road later formed the downhill section of the extension of the course to its current length.

The rally course paid its way, in 1974, 75 and 76 it hosted large crowds of spectators on the “RAC”, and as a bonus De Lacy MC’s Mintex Rally also used the stage in 1975 and ’76, and were due there in 1977 but heavy snow forced the cancellation of the stage. At that time the Centre had a small band of Rally Stage Commanders and senior officials who came out to play in winter when the race and speed event season was over, whose peak of achievement was running the Rally Start area at Harrogate when the Rally first moved away from its traditional London start, the occasion being commemorated in the famous Barry Hinchcliffe film “From Harrogate It Started”. That also happened to be the first time that hand-held radios were used in the organisation of a Rally, courtesy of our tame radio expert Richard Hardcastle. We were also leaders in the use of radios in our hillclimbs and race meetings.

In 1981 Derek Clark became Chairman, and when Arnold Burton put the farm on the market he was responsible for setting up Harewood Hill Ltd, greatly assisted by Stephen Smith, Jim Thompson, Richard Jackson and Michael Kempley who together with a group of members, assisted by BARC Headquarters, worked tirelessly to fund the purchase of the farm, with many contributions coming from marshals and competitors.

Following Derek’s untimely death in 1982, his son Simon took over the reins and the development of the hill was pushed ahead by its new owners. A permanent toilet block was built, a club house was created in the barns and a major development was the installation of Armco barriers, with valued assistance from Ivor Pashley, and less significant alterations were made to satisfy the Motor Sports Association’s safety inspector as required.

Towards the end of the eighties there was much discussion in committee about the possibility of making major alterations to the course. Jimmy Johnstone had taken over the Chair and a team comprising John Staveley, Bob Wright and Simon Clark designed a course extension. At one stage a plan to move the paddock down the hill was considered, but after consulting the competitors this was abandoned as the hilltop paddock, with its spectacular view of almost the whole of the course, was regarded as one of Harewood’s major attractions. In the end a new start below the farm was created and a new track was formed using part of the rally course. After the flat start came Clarks, a sharp right-hander leading into a downhill section, where the fastest cars reached speeds in excess of 100 mph, followed by a testing right, left, right sequence to join the original course just above the old start pad. Houseman and Falshaw did the track construction work and the tyre walls were installed by voluntary labour.

The first meeting was held on the new course on 16 May 1992, when Paul Rendle’s Chevron B49 set the course record; this was promptly broken the following day by Chris Seaman’s Brabham BT30. One immediate effect was that regular competitors were arriving at Country much faster than before, which gave the marshals plenty of work to recover cars from the infield until the drivers got used to arriving over the brow with all wheels off the ground. The extension made the course the longest in England and, coupled with the new access road for getting the cars to the start, enhanced the popularity of the hill. Such has been the development of cars that the current record for the long course is just over half a second less than the 1963 record for the short course.

Anyone walking in the paddock today might wonder at the stout concrete pad behind the Paddock Marshals’ hut, accompanied by a twelve-inch square oak post surmounted by a metal box and some serious cables. This was the home of the Bus, which for many years provided the transport for all the “tackle” needed to set up the hill for action in its cavernous luggage compartment, and the shelter for all the administrative staff when the meeting was running. The box on the post provided connections for all power, telephone and timing links and when the Bus was backed onto its pad and connected up the Secretary could sign on competitors, the Clerk of the Course and Chief Observer could talk to each post, and the Timekeeper could time the cars and issue the results to be typed on “skins” and Gestetner processed. The Bus started life as an RAF Commer Crew Bus, retired to BOAC as a passenger and luggage bus, from that to BARC use, and finally in total retirement went to the Yorkshire Air Museum at Elvington. There it has been completely and beautifully restored to its RAF specification and is on display for all to admire. It was replaced at Harewood by a Portakabin – practical, but not quite as much soul – which was in time replaced by an ex-Ribble Transport double-decker ‘bus and eventually by a showground hospitality unit towed up to the top of the paddock for every meeting.

BARC Yorkshire Centre continues to run all the hillclimb meetings at Harewood, including 2 rounds of the MSA British Hillclimb Championship and a Classic & Vintage meeting. The Centre, now chaired by Tim Wilson, continues to develop the venue, including a comprehensive timing and results system now housed within an impressive permanent control building, formally opened in 2011 by the man responsible for the birth of the North’s premier hillclimb, Arnold Burton.